Topics for Discussion

1) Amended Terms of Reference
a) the first round of amendments - prompted by BEI

The first round of amendments were prompted by the number of comments received from the public and government reviewers. These changes included:

  • Clarification of sections quoted for the Environmental Protection Act – page 2
  • Adding the parameters proposed for continuous emission monitoring – page 2
  • Adding that test burn results and continuous emission monitoring test results will be presented in the EA – page 3
  • Adding the service area and that BEI will abide by all laws – page 3
  • Adding the mining lease reference for the proposed site – page 3
  • Adding that the descriptions of existing environment will be based on additional baseline monitoring – page 4
  • Adding survey seasons for Section 5.2.1.4 – page 5
  • Adding an ecosystem assessment of the confluence of the Blanche River and Murdock Creek to Section 5.2.1.4 – page 6
  • Adding under Section 5.3 that the potential effects will be considered by the same consultants that considered existing environmental effects – page 9
  • Adding an Ecological Risk Assessment to Section 5.3 – page 9
  • Modifying the date under Section 6.3 for Notification of ToR approval to take into account time for ToR amendments – page 11
  • Adding The Department of Fisheries and Oceans under Section 6.4.7 – page 13
  • Adding the Province of Quιbec under Section 6.4.7 – page 14
  • Adding MCTV (Timmins/North Bay) to the media outlets under Section 6.6.1 – page 15
  • Including reference to the Ecological Risk Assessment under Table 2 – page 21
  • Clarifying that the Mother’s Milk scenario under Table 3 will include all exposure pathways – page 22
  • Adding Ecological Exposure Pathways under Table 4 – page 23

2) Status of the Environmental Assessment process

The EA approval process is at the end of the Formal ToR approval stage. We are currently awaiting a decision from the Ministry of the Environment. The decision could be one of four:

  • Approve
  • Reject
  • Approve with amendments
  • Send outstanding issues in ToR to mediation

3) Status of Consultant Reports

The Traffic report is complete, the economic report is being finalized, the air dispersion and emission modelling report is being finalized.

Once the air report has been finalized, it will be immediately sent to the Agricultural, Social/Cultural, Biophysical and Ground/Surface water, HHRA consultants. They will use the data in their reports for potential effects. This will probably take up to a month to a month and a half.

4) Queenston Mining Inc. issue

a) Letters Exchanged
b) Status of issue

5) Meetings with other groups

a) Rotary Club - Met with the Rotary Club on Monday March 26th, 2001

b) Temiskaming Municipal Association - a tentative meeting set for June 30th, 2001

c) Temiskaming Federation of Agriculture - Hope to meet in the near future

d) Northwatch - Hope to meet in the near future

e) anti-Adams Mine Coalition - Hope to meet in the near future

6) Future meetings when draft EA is available

  • First Nations Organizations
  • Open House in Kirkland Lake
  • Open House in New Liskeard
  • Temiskaming Municipal Association
  • The Town of Kirkland Lake
  • The CAC

7) Canadian Environmental Law Association
Will try to schedule a meeting with in the near future. Representing both Northwatch and the Temiskaming Federation of Agriculture


For more information please contact us at info@bennettenv.com

© 2001 Bennett Environmental Inc.

 Terms of Reference

Click Here


 Background
 Documents

Document #1
Addendum to Doc #1

Document #2
Addendum to Doc #2

Document #3

Document #4
Addendum to Doc #4

Document #5
Addendum to Doc #5

Document #6

Document #7

Consulting Team


 Citizen's Advisory
 Committee

Click Here


 Public Consultation

Click Here


 Important Links

Click Here